Weekly Spotlights

This page is a collection of weekly spotlights that highlight the progress of the integration team. Each spotlight is a summary of the work done by the team in a week.

Member status:

  • 🔍: Research
  • 💻: Development
  • 📝: Documentation
  • 🔄: Refactoring
  • 🔧: Bug fixing
  • 🤝: Participation in other subteam

2026-03-24

Name Status
Fregoso 💻
Samuel 💻
Daniel hinojosa 💻
Ximena 🤝
Rogelio 🤝
Rodrigo 🤝
  • Development

  • 8 LiFePO4 cells acquired and ready, providing a total of 24V for the robot's power system. This completes the battery pack needed for the new BMS.

  • BMS (Battery Management System) PCB fully assembled with all SMD components soldered. The board includes the main battery management IC, power MOSFETs for cell balancing, USB-C interface for firmware upload, JST connectors for cell monitoring, and copper bus bars for high-current PACK-/BAT- connections. Minor fixes pending for final adjustments.

BMS PCB Closeup BMS PCB Assembled

  • USB HUB arrived for centralized connectivity of the robot's computing and sensor modules.

HUB Heatsink

In progress:

  • Firmware upload testing for the BMS scheduled for this week. This will validate cell balancing logic, overvoltage/undervoltage protection, and communication with the robot's main system.

2025-11-07

Name Stauts
Fregoso 💻
Ximena 🤝
Rogelio 🤝
Rodrigo 🤝
Samuel 💻
Daniel hinojosa 💻

Development: - Finished BMS PCB

On planning: - Get LIFEPO 3V 20A batteries - PCB that distributes power in Frida

2025-3-6

Name Stauts
Yair 🔍
Fregoso 💻
David 📝
Lopez 📝
Ximena 💻
Rogelio 💻
Rodrigo 💻
Daniel hinojosa 💻

Development: - PCB @home finished

On planning: - Checking different alternatives energy - checking base