Weekly Spotlights

This page is a collection of weekly spotlights that highlight the progress of the Mechanics team. Each spotlight is a summary of the work done by the team in a week.

2025-04-03

Done:

  • Finish main aluminum profile structure to increase the height of the xArm and to add more support points in the DashGo to avoid the robot overturn.
  • Add tags to the robot voltmeters and switches.
  • Meeting with Dr. Enrique Cuan for possible research paper collaboration.

In progress:

  • Fix gripper design to operate to the servo range from 0 to 120° due to an error in our specific servo unit.
  • Reprint gripper pieces with the aforementioned fix.
  • Test the improvements of the new structure and do fixes accordingly.
  • Finish new Robot cover design to comply with the new structure.