Weekly Spotlights
This page is a collection of weekly spotlights that highlight the progress of the Mechanics team. Each spotlight is a summary of the work done by the team in a week.
2025-04-03
Done:
- Finish main aluminum profile structure to increase the height of the xArm and to add more support points in the DashGo to avoid the robot overturn.
- Add tags to the robot voltmeters and switches.
- Meeting with Dr. Enrique Cuan for possible research paper collaboration.
In progress:
- Fix gripper design to operate to the servo range from 0 to 120° due to an error in our specific servo unit.
- Reprint gripper pieces with the aforementioned fix.
- Test the improvements of the new structure and do fixes accordingly.
- Finish new Robot cover design to comply with the new structure.