Sprints
Sprint spotlights for the Electronics area, generated every week from the project board and reviewed by the area PM before merging. Newest sprint first.
Status legend:
- 💻 Development
- 🔍 Research
- 📝 Documentation
- 🔧 Bug fixing
Sprint 3 · 2026-09-21 → 2026-10-11
Sprint plan
1 tasks planned for this sprint.
Todo:
- Becca-731, LARC 💻 Solder and test gripper PCB (P1, #1203)
Sprint 2 · 2026-08-31 → 2026-09-20
Sprint plan
2 tasks planned for this sprint.
Todo:
- Becca-731, LARC 💻 Solder and test gripper PCB (P1, #1203)
- Unassigned 💻 Determine FRIDA's peak amperage requirement (#1250)
Week 1 · 2026-08-31 → 2026-09-06
Not started: 2 tasks.
Sprint results
1/2 tasks done (50%).
This sprint aimed to determine peak amperage and add a power cable for the hub. The team successfully added the extra 12V power cable for the hub (P1). Determining FRIDA's peak amperage requirement remains pending.
Done:
- Jasiel Aldana Palacios 💻 Add extra 12V power cable for hub (P1, #1276)
Carried over:
- Becca-731 💻 Determine FRIDA's peak amperage requirement (Todo, #1250)
Sprint 1 · 2026-08-10 → 2026-08-30
Sprint results
2/2 tasks done (100%) · P0: 2/2.
Done: